Verification throughout
the equipment lifecycle.
Material identification, fabrication oversight, inspection, and testing support conformance with the project requirements. The inspection scope and acceptance criteria are defined for the equipment and its intended service.
A hydrostatic test, step by step.
Pressure vessels built to ASME Section VIII, Division 1 are pressure-tested before they leave the shop. Run the test on the model: the gauges, the stress in the shell and the dial indicator all follow one calculation.
Connect the requirements
with the next step.
Share the available information with our team so we can evaluate the equipment scope and coordinate the work.
- Design and fabrication requirements
- Inspection and test plan
- Acceptance criteria and witness points
- Documentation and turnover requirements
Explore the full lifecycle.
Engineering
Design decisions informed by the process duty, operating conditions, and project specification.
Explore capability 02 / MANUFACTURINGManufacturing
Fabrication, welding, forming, and assembly coordinated around the approved design.
Explore capability 03 / INSPECTIONInspection
Material controls, inspection activities, and testing aligned with project requirements.
Explore capability 04 / DELIVERYDelivery
Equipment and documentation prepared for project handover and continuing support.
Explore capability
